Commercial Solar Installations Nationwide

The Commercial Solar Company

Tel: 0333 049 7581

Mon–Fri 9 AM – 5 PM, Sat 9 AM – 1 PM

MCS Certified Installation

Future Proof Your Business

Nationwide Coverage

Commercial solar in Cheshire

Commercial Solar Panel Installers in Cheshire

Cheshire combines major logistics parks, chemical and automotive manufacturing and a large rural economy, all with strong daytime energy demand. We arrange commercial solar surveys and installations in Warrington, Chester, Crewe, Macclesfield, Northwich, Runcorn, Widnes and Ellesmere Port.

  • Warehouses, factories and farms
  • Rooftop solar and battery storage
  • MCS certified installers across Cheshire

Get a Free Commercial Solar Assessment

Step 1: What is your business property type?

Free, no-obligation quote. Or go to the full form.

Who we work with

Commercial solar panels for Cheshire businesses

From Omega and Birchwood in Warrington to the chemical works around Runcorn and Northwich, Cheshire has some of the North West’s largest commercial roofs.

Logistics and distribution

Warehouses along the M6, M56 and M62. Solar for warehouses.

Chemicals and process industries

Energy-intensive sites around Runcorn, Widnes and Northwich. Solar for factories.

Automotive and engineering

Manufacturing and supply-chain businesses around Crewe and Ellesmere Port.

Offices and business parks

Warrington, Chester and Macclesfield business parks.

Dairy farms

Dairy and livestock farms with milking and cooling loads. Solar for farms.

Care homes

24/7 demand with solar and storage. Solar for care homes.

Local knowledge

Commercial solar installation in Cheshire: what to know

Cheshire is covered mainly by SP Energy Networks, with SP Electricity North West serving some areas in the north of the county. We confirm your network operator and make the G99 application.

Dairy farms are a strong fit for solar because milking, cooling and water heating run every day of the year. Large modern warehouses and process sites can take very large rooftop systems after a structural check.

Rooftop solar on most commercial buildings in England falls under permitted development, subject to conditions. Chester’s historic centre has many listed buildings and conservation areas, which we check before quoting.

How it works

From survey to switch-on

1. Free site survey

An MCS certified installer visits your premises, checks the roof or land and reviews your energy use.

2. Design and fixed quote

You get a system design with expected generation, savings and payback, and a fixed price.

3. Grid application

We apply to SP Energy Networks or SP Electricity North West for G99 approval and confirm any export limits for your site.

4. Installation and handover

The system is installed around your operations, commissioned, and handed over with MCS certification and monitoring.

Costs

How much does commercial solar cost in Cheshire?

Commercial solar costs depend mainly on system size. Larger systems cost less per kW, and businesses that use most of their power during the day see the quickest payback.

System sizeTypical cost (ex VAT)Suitable for
10kW£13,000–£15,000Small offices, shops, cafés
20kW£16,000–£30,000Small warehouses, schools
50kW£33,000–£60,000Medium factories, leisure centres
100kW£60,000–£120,000Large factories, distribution centres

Prices exclude VAT and come from our commercial solar cost guide. Installation costs are broadly the same across mainland UK; your quote depends on roof type, access, scaffolding, grid connection and the equipment you choose.

Solar PV usually qualifies for capital allowances, including the Annual Investment Allowance (100% relief on up to £1 million of qualifying spend a year). Your accountant will confirm what applies to you.

EV charging

Commercial EV charging in Cheshire

Adding EV chargers alongside solar lets vehicles at your Cheshire site run on electricity your own roof generates. We design solar, battery storage and EV charging as one system, working with accredited installation partners where required.

Workplace EV charging

Staff and pool cars charging during the working day, when solar generates most.

Fleet and depot charging

Vans and cars that return to base and charge overnight or between shifts, with a battery storing solar for later.

Destination charging

Customers and guests charging at hotels, retail and leisure sites.

Chargers add load to your supply, so we check capacity before design and involve the local network operator (Electricity North West or SP Energy Networks, depending on where your site is) early where an upgrade may be needed. See commercial EV charging and solar EV charging for more.

Commercial solar in Cheshire: FAQs

Which areas of Cheshire do you cover?

Warrington, Chester, Crewe, Nantwich, Macclesfield, Congleton, Northwich, Winsford, Runcorn, Widnes and Ellesmere Port.

Is solar worth it for a dairy farm?

Yes. Milking and milk cooling create steady daily demand that solar can cover, with batteries for early and late milkings.

Who is the network operator in Cheshire?

Mostly SP Energy Networks, with SP Electricity North West in parts of the north. We handle the application.

Can process sites use all their solar?

Usually. Energy-intensive sites with daytime operations use almost all the power their panels produce.

Get a free commercial solar survey in Cheshire

Tell us about your premises and we’ll arrange a free survey with a local MCS certified installer.

Free solar & ROI assessment