Most ground-mounted solar panels on business or farm land in the UK need planning permission. In England, only a single small stand-alone array, no bigger than 9 square metres, counts as permitted development on non-domestic land. Any commercial ground-mounted system or solar farm needs a full planning application.

Rooftop solar is different. Most business roofs can take panels without a planning application, which is one reason many businesses start there.

Do ground-mounted solar panels need planning permission in the UK?

Yes. Ground-mounted solar panels need planning permission in the UK unless the array is very small. Permitted development rights for stand-alone solar on non-domestic land in England cover a single array of up to 9 square metres, which is roughly three to five panels. A commercial array of 50kW or more is far larger, so it needs consent.

The rules differ in Wales and Scotland, so check with your local planning authority before you start.

What are the permitted development limits for ground-mounted solar on business land?

The permitted development limits for stand-alone solar in the grounds of a non-domestic building in England cover size, height, boundary distance and number. Every limit must be met. The Planning Portal sets them out as follows:

LimitRule
NumberOnly the first stand-alone installation is permitted development
Maximum size9 square metres, or 3m wide by 3m deep
Maximum height4 metres
Distance from boundaryAt least 5 metres
Listed buildings and scheduled monumentsNot allowed within their grounds

Two conditions also apply. The equipment must be sited to minimise its effect on the area’s amenity, and it must be removed once it is no longer needed. These rules date back to changes that took effect in April 2012.

When do you need full planning permission for ground-mounted solar?

You need full planning permission for ground-mounted solar whenever the array breaks any permitted development limit. In practice that means every commercial ground-mounted system, every solar farm and any second stand-alone array on the same site.

You also need permission, or at least early advice from the council, when the site is in a conservation area, national park, national landscape or the setting of a listed building.

Who decides a solar farm planning application?

Who decides a solar farm planning application depends on the farm’s capacity and which UK nation it sits in. Smaller schemes go to the local council. The largest go to national government.

NationDecided by the councilDecided nationally
EnglandUp to 100MWOver 100MW, through a Development Consent Order
WalesUnder 50MW (schemes of 35–50MW can ask to be decided nationally)50–350MW by Welsh Ministers as Significant Infrastructure Projects, since 16 March 2026; over 350MW by the UK government
ScotlandUp to 50MWOver 50MW by Scottish Ministers under section 36

England raised its national threshold from 50MW to 100MW on 31 December 2025. Solar farms between 50MW and 100MW now go through the council instead of the national process.

What do councils look at in a ground-mounted solar planning application?

Councils look at how a ground-mounted solar scheme affects the landscape, neighbours, wildlife, flooding and farmland. Local solar guidance typically covers glint and glare, residential amenity, rights of way, and flooding and drainage, alongside landscape, heritage and ecology.

The main planning issues:

What documents go into a ground-mounted solar planning application?

A ground-mounted solar planning application usually includes a site plan and layout, elevation drawings of the panels and equipment, and a set of supporting reports. For a commercial array or solar farm, expect to submit:

  1. A planning statement explaining the scheme and how it meets policy
  2. A landscape and visual impact assessment
  3. An ecology survey and biodiversity net gain assessment
  4. A flood risk assessment and drainage strategy
  5. A glint and glare study
  6. A heritage assessment where needed
  7. An agricultural land classification survey for farmland sites
  8. A construction traffic management plan

Smaller commercial arrays need fewer reports. Ask the council for pre-application advice to confirm what it wants.

How long does planning permission take for ground-mounted solar?

Planning permission for ground-mounted solar usually takes 8 to 13 weeks once the council validates the application. Major schemes have a 13-week target, or 16 weeks where an environmental impact assessment is needed. Surveys and pre-application talks add time before you submit, so build several months into your plan.

Do solar carports need planning permission?

Solar carports often don’t need planning permission in England. Since 2023, permitted development rights allow solar canopies over non-domestic off-street parking, subject to limits including a maximum height of 4 metres. Our solar carports page covers design options.

Ground-mounted solar planning FAQs

Can I put solar panels in a field without planning permission?

Only a single small array of up to 9 square metres, at least 5 metres from the boundary and no more than 4 metres high. Anything larger needs planning permission.

Does rooftop commercial solar need planning permission?

Usually not. Rooftop solar on non-domestic buildings in England is generally permitted development, and the 1MW limit was removed in 2023. Listed buildings and some protected areas still need consent.

How long does solar planning permission last?

A planning permission in England usually lasts three years. You must start work within that time or apply again.

How close can a solar farm be to houses?

There is no fixed national minimum distance. Our guide to how close a solar farm can be to a house explains how councils judge it.